Skip to content

EGR GYM timeline: from 2024 to the opening in Carpina

From the first announcement in October 2024 to the opening in September 2026: EGR GYM's main milestones in Carpina, period by period.

EGR GYM building with the green logo, seen from the terrace, in Carpina, Pernambuco

EGR GYM, a gym in Carpina, Pernambuco (Brazil), was announced on October 28, 2024, held its grand opening on September 25, 2026, and opened its doors to the public on September 28, 2026, at Av. Pres. Getúlio Vargas, 923 (Rua dos Tamarindos), Santa Cruz, Carpina - PE. Between those dates, EGR launched the EGRCast podcast, took health initiatives to the streets of the city, introduced its team and formed partnerships. This timeline brings together the main milestones, period by period.

All dates below correspond to posts on our official Instagram profile, @egrgym, which documented every step of the journey. For a more narrative read, including the meaning of the name and the motivation of the founder, Edval Júnior, we recommend the article on how EGR GYM was born in Carpina.

How was EGR GYM announced in 2024?

October 28, 2024: the first announcements

EGR GYM's first three posts announced to Carpina a gym with innovation, technology, state-of-the-art equipment and personalized training. One of them summed up the anticipation: “EGR GYM is about to make history in Carpina!”.

November 2, 2024: “Welcome to EGR GYM”

A few days later, the profile's first video, “Welcome to EGR GYM: The Well-Being Revolution in Carpina”, presented the goal of redefining the concept of quality of life in the city.

What were EGR GYM's milestones in 2025?

February to July 2025: the community grows

  • February 26: EGR thanked the public for their support even before opening its doors and stressed that it was preparing a space that would go far beyond a gym, with quality facilities and dedicated professionals.
  • May 23 and July 3: the profile reached 3,000 and then more than 4,000 followers, while the gym was still under construction.

June to November 2025: EGRCast

  • June 11: Visão Comunica shared behind-the-scenes footage of a new show produced in partnership with EGR.
  • July 7: EGR released the EGRCast trailer, a project created to inspire, inform and bring the public closer to the essence of the gym.
  • July 8: the first episode premiered, featuring founder Edval Júnior. Four more episodes aired between July and August, and the sixth was published on November 4.

All six episodes are gathered in the guide EGRCast: get to know the EGR GYM podcast.

September 2025: the Well-Being X-Ray

On September 10, EGR introduced the Raio-X do Bem-Estar (Well-Being X-Ray), a quick quiz on sleep, energy, nutrition and mood, with personalized feedback from a specialist via WhatsApp. The team also began calling it the MQV (Quality of Life Assessment).

October and November 2025: EGR on the streets

See more about EGR GYM's events before the opening.

What happened in 2026 leading up to the opening?

February 2026: listening on the streets

  • February 4: the team took to the streets of Carpina to ask what keeps people from taking care of their health. The conclusion: the challenge is not wanting to, but dealing with routine, fatigue and the difficulty of making yourself a priority.
  • February 5: the takeaway from that listening: EGR is born for real people, with real routines, respecting limits and building consistency.

February and March 2026: the coaches

Between February 19 and March 3, EGR introduced coaches Alex Andrade, Leonardo Almeida, Laís Rodrigues, Marina Moura, João Oliveira and Renata Lopes.

April 2026: a sneak peek, ExpoCarpina and the 2nd Functional Run

May and June 2026: a partnership and the full team

August and September 2026: equipment, grand opening and opening day

The opening night is covered in the article about the EGR GYM grand opening on September 25, 2026.

What happened after the opening?

The next chapter of this story is being written with our members. To be part of it, sign up now or talk to our team on WhatsApp.

Frequently asked questions

When did EGR GYM open?

EGR GYM's grand opening took place on September 25, 2026, on a special night for the first members and guests. It opened to the public on September 28, 2026.

When was EGR GYM announced in Carpina?

EGR GYM's first posts were published on Instagram on October 28, 2024, announcing the arrival in Carpina of a gym with innovation, technology and personalized training.

Where is EGR GYM located?

EGR GYM is located at Av. Pres. Getúlio Vargas, 923 (Rua dos Tamarindos), Santa Cruz, Carpina - PE, Brazil.

What events did EGR GYM hold before opening?

Before the opening, EGR held EGR in Action and the 1st Functional Run in October 2025, took part in the Petribu event in November 2025, and was at ExpoCarpina and the 2nd Functional Run in April 2026.

Sources and references

  1. Instagram @egrgym: first announcement of EGR GYM in Carpina (28/10/2024)
  2. Instagram @egrgym: “Welcome to EGR GYM” (02/11/2024)
  3. Instagram @egrgym: EGRCast trailer (07/07/2025)
  4. Instagram @egrgym: Well-Being X-Ray (10/09/2025)
  5. Instagram @egrgym: EGR in Action (30/10/2025)
  6. Instagram @egrgym: Petribu event (27/11/2025)
  7. Instagram @egrgym: survey on the streets of Carpina (04/02/2026)
  8. Instagram @egrgym: ExpoCarpina (26/04/2026)
  9. Instagram @egrgym: partnership with Laboratório Nabuco Lopes (14/05/2026)
  10. Instagram @egrgym: arrival of the equipment (27/08/2026)
  11. Instagram @egrgym: grand opening and public opening dates (22/09/2026)
  12. EGR GYM on Google Maps (Carpina - PE)

Keep reading

First step

Your transformation starts here.

A new concept in training, health and quality of life. Enroll online or talk to our team on WhatsApp.

Talk to EGR GYM

Before you continue, what should we call you?

Leave your name and WhatsApp: if needed, our team will reach out to help you.

If your browser asks, allow location access: we only use it to know your city.